Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

78

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Nonmetallic mineral product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1049 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,601 $1,060
OK1049 #03 Y:2021 Reduce the pressure of compressed air to the minimum required $1,589 -
OK1049 #02 Y:2021 Utilize higher efficiency lamps and/or ballasts $552 $820
OK1049 #01 Y:2021 Optimize plant power factor $5,159 $6,000
OK1042 #04 Y:2021 Replace existing hvac unit with high efficiency model $303 $1,200
OK1042 #03 Y:2021 Conserve energy by efficient use of vending machines $178 $308
OK1042 #02 Y:2021 Reduce the pressure of compressed air to the minimum required $1,703 -
OK1042 #01 Y:2021 Recover waste heat from equipment $1,084 $813
OK0981 #06 Y:2017 Optimize plant power factor $11,423 $50,570
OK0981 #05 Y:2017 Install waste heat boiler to provide direct power $353,111 $2,500,000
OK0981 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $21,343 $69,050
OK0981 #03 Y:2017 Install compressor air intakes in coolest locations $16,309 $4,937
OK0981 #02 Y:2017 Reduce the pressure of compressed air to the minimum required $7,815 -
OK0981 #01 Y:2017 Upgrade controls on compressors $124,716 $75,000
OK0898 #13 Y:2014 Replace treated water with well / surface water $10,867 $27,400
OK0898 #12 Y:2014 Use or replace with energy efficient substitutes $20,273 $45,000
OK0898 #11 Y:2014 Purchase new equipment to reduce material use / cost $89,952 $75,900
OK0898 #10 Y:2014 Use optimum thickness insulation $6,545 $27,400
OK0898 #09 Y:2014 Insulate bare equipment $90 $178
OK0898 #08 Y:2014 Replace hydraulic / pneumatic equipment with electric equipment $1,045 $1,060