Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Architectural Glass
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 130,000
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $594,765 9,293,200
kWh
Electricity Demand $181,666 25,337
kW-mo/yr
Natural Gas $6,656 1,698
MMBtu
Waste Disposal Costs
Water Usage $22,077 3,654
Tgal
TOTAL YEARLY COSTS $805,164
RECOMMENDED SAVINGS* $9,901 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $5,159 $6,000 - - $5,159
02 2.7142: Utilize higher efficiency lamps and/or ballasts $552 $820 $414
6,466
kWh
$138
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,589 - $1,589
24,827
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,601 $1,060 $2,601
40,635
kWh
- -
TOTAL RECOMMENDED $9,901 $7,880 $4,604
71,928
kWh
$138
-
kW-mo/yr
$5,159
TOTAL IMPLEMENTED $4,742 $1,880 $4,604
71,928
kWh
$138
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs