| Assessment Year | 2021 |
|---|---|
| Principal Product | Architectural Glass |
| NAICS | 327215: Glass Product Manufacturing Made of Purchased Glass |
| SIC | 3231: Glass Products, Made of Purchased Glass |
| Sales Range | $50 M to 100M |
| # of Employees | 120 |
| Plant Area |
130,000
ft2
|
| Annual Production | 7,500,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $594,765 | 9,293,200 |
kWh
|
$0.064 | |
| Electricity Demand | $181,666 | 25,337 |
kW-mo/yr
|
$7.17 | |
| Natural Gas | $6,656 | 1,698 |
MMBtu
|
$3.92 | |
| Waste Disposal Costs | |||||
| Water Usage | $22,077 | 3,654 |
Tgal
|
$6.04 | |
| TOTAL YEARLY COSTS | $805,164 | ||||
| RECOMMENDED SAVINGS* | $9,901 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $4,742 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $5,159 | $6,000 | - | - | $5,159 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $552 | $820 |
$414
6,466
kWh
|
$138
-
kW-mo/yr
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,589 | - |
$1,589
24,827
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,601 | $1,060 |
$2,601
40,635
kWh
|
- | - | |
| TOTAL RECOMMENDED | $9,901 | $7,880 |
$4,604
71,928
kWh
|
$138
-
kW-mo/yr
|
$5,159 | ||
| TOTAL IMPLEMENTED | $4,742 | $1,880 |
$4,604
71,928
kWh
|
$138
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs