Assessment Year | 2015 |
---|---|
Principal Product | Ductile iron fittings |
NAICS | 331511: Iron Foundries |
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $10 M to 50M |
# of Employees | 450 |
Plant Area |
100,000
ft2
|
Annual Production | 28,000
ton
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,543,497 | 37,728,783 |
kWh
|
$0.067 |
Electricity Demand | $0 | 100,240 |
kW-mo/yr
|
$0.000 |
Electricity Fees | $57,029 | - |
|
- |
Natural Gas | $478,031 | 84,757 |
MMBtu
|
$5.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $339,257 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,926 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $101,481 | $4,160 |
$101,844
1,510,591
kWh
|
$(-363.0) | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $79,593 | $13,795 |
$79,878
1,184,787
kWh
|
$(-285.0) | |
03 | 2.4224: Upgrade controls on compressors | $19,427 | $5,250 |
$19,497
289,187
kWh
|
$(-70.0) | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,333 | $5,604 |
$6,356
94,271
kWh
|
$(-23.0) | |
05 | 2.4239: Eliminate or reduce compressed air usage | $6,250 | $5,480 |
$6,272
93,032
kWh
|
$(-22.0) | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $115,247 | $202,454 |
$115,659
1,715,496
kWh
|
$(-412.0) | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,926 | $10,430 |
$10,965
162,640
kWh
|
$(-39.0) | |
TOTAL RECOMMENDED | $339,257 | $247,173 |
$340,471
5,050,004
kWh
|
$(-1,214.0) | ||
TOTAL IMPLEMENTED | $10,926 | $10,430 |
$10,965
162,640
kWh
|
$(-39.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs