ITAC Assessment: OK1042
ITAC logo
ITAC Assessment: OK1042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Flat Annealed Tempered Glass
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 170,000
ft2
Annual Production 660,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $252,000 7,000,000
kWh
Electricity Demand $123,002 31,539
kW-mo/yr
Electricity Fees $3,360 -
Natural Gas $5,114 1,298
MMBtu
Waste Disposal Costs
Water Usage $27,749 5,357
Tgal
TOTAL YEARLY COSTS $411,225
RECOMMENDED SAVINGS* $3,268 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,703

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $1,084 $813 - $1,084
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,703 - $1,703
47,300
kWh
-
03 2.6211: Conserve energy by efficient use of vending machines $178 $308 $178
4,992
kWh
-
04 2.7232: Replace existing hvac unit with high efficiency model $303 $1,200 $303
8,422
kWh
-
TOTAL RECOMMENDED $3,268 $2,321 $2,184
60,714
kWh
$1,084
-
MMBtu
TOTAL IMPLEMENTED $1,703 - $1,703
47,300
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs