| Assessment Year | 1991 |
|---|---|
| Principal Product | FIBERGLASS PANEL |
| NAICS |
n/a
|
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | $50 M to 100M |
| # of Employees | 130 |
| Plant Area |
n/a
|
| Annual Production | 40,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $220,055 | 4,773,154 |
kWh
|
$0.046 |
| Natural Gas | $361,083 | 144,998 |
MMBtu
|
$2.49 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,623 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $3,936 | $4,500 |
$3,936
-
kWh
|
- | |
| 02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $4,115 | - |
$4,115
127,491
kWh
|
- | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $931 | - |
$931
19,637
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $885 | - |
$885
11,723
kWh
|
- | |
| 05 | 2.1224: Replace boiler | $13,756 | - | - |
$13,756
-
MMBtu
|
|
| TOTAL RECOMMENDED | $23,623 | $4,500 |
$9,867
158,851
kWh
|
$13,756
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs