ITAC Assessment: OK0898
ITAC logo
ITAC Assessment: OK0898
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Ready mix concrete
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 45,256
ft2
Annual Production 550,000
units
Production Hrs. Annual 3,744
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,597 1,154,760
kWh
Natural Gas $38,671 6,509
MMBtu
Fuel Oil #2 $20,273 18,194
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $151,868 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,116

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Other Gas Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7231: Use radiant heater for spot heating $12,191 $15,000 - $12,191
-
MMBtu
- - - - -
02 2.6232: Install set-back timers $3,689 $1,965 $3,689
46,117
kWh
- - - - - -
03 2.2437: Recover waste heat from equipment $1,132 $1,689 - $1,132
-
MMBtu
- - - - -
04 2.7211: Clean and maintain refrigerant condensers and towers $303 $270 $303
3,786
kWh
- - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,300 $11,014 $4,300
53,760
kWh
- - - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,345 $5,971 $1,345
16,817
kWh
- - - - - -
07 2.4221: Install compressor air intakes in coolest locations $136 $463 $136
1,703
kWh
- - - - - -
08 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,045 $1,060 $1,045
13,061
kWh
- - - - - -
09 2.2511: Insulate bare equipment $90 $178 $90
1,128
kWh
- - - - - -
10 2.2515: Use optimum thickness insulation $6,545 $27,400 $3,058
38,225
kWh
$3,487
-
MMBtu
- - - - -
11 4.132: Purchase new equipment to reduce material use / cost $89,952 $75,900 $(-1,515.0)
(-18,938)
kWh
- - - $(-139.0)
-
gal
$91,607 -
12 2.4322: Use or replace with energy efficient substitutes $20,273 $45,000 - - $43,281
-
MMBtu
$(-23,008.0)
-
MMBtu
- - -
13 3.4159: Replace treated water with well / surface water $10,867 $27,400 - - - - - - $10,867
-
Tgal
TOTAL RECOMMENDED $151,868 $213,310 $12,451
155,659
kWh
$16,810
-
MMBtu
$43,281
-
MMBtu
$(-23,008.0)
-
MMBtu
$(-139.0)
-
gal
$91,607 $10,867
-
Tgal
TOTAL IMPLEMENTED $8,116 $29,822 $3,497
43,714
kWh
$4,619
-
MMBtu
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Other Gas Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs