Assessment Year | 2014 |
---|---|
Principal Product | Ready mix concrete |
NAICS | 327320: Ready-Mix Concrete Manufacturing |
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
45,256
ft2
|
Annual Production | 550,000
units
|
Production Hrs. Annual | 3,744
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $90,597 | 1,154,760 |
kWh
|
$0.078 |
Natural Gas | $38,671 | 6,509 |
MMBtu
|
$5.94 |
Fuel Oil #2 | $20,273 | 18,194 |
MMBtu
|
$1.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $151,868 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,116 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Other Gas Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $12,191 | $15,000 | - |
$12,191
-
MMBtu
|
- | - | - | - | - | |
02 | 2.6232: Install set-back timers | $3,689 | $1,965 |
$3,689
46,117
kWh
|
- | - | - | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $1,132 | $1,689 | - |
$1,132
-
MMBtu
|
- | - | - | - | - | |
04 | 2.7211: Clean and maintain refrigerant condensers and towers | $303 | $270 |
$303
3,786
kWh
|
- | - | - | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,300 | $11,014 |
$4,300
53,760
kWh
|
- | - | - | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,345 | $5,971 |
$1,345
16,817
kWh
|
- | - | - | - | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $136 | $463 |
$136
1,703
kWh
|
- | - | - | - | - | - | |
08 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $1,045 | $1,060 |
$1,045
13,061
kWh
|
- | - | - | - | - | - | |
09 | 2.2511: Insulate bare equipment | $90 | $178 |
$90
1,128
kWh
|
- | - | - | - | - | - | |
10 | 2.2515: Use optimum thickness insulation | $6,545 | $27,400 |
$3,058
38,225
kWh
|
$3,487
-
MMBtu
|
- | - | - | - | - | |
11 | 4.132: Purchase new equipment to reduce material use / cost | $89,952 | $75,900 |
$(-1,515.0)
(-18,938)
kWh
|
- | - | - |
$(-139.0)
-
gal
|
$91,607 | - | |
12 | 2.4322: Use or replace with energy efficient substitutes | $20,273 | $45,000 | - | - |
$43,281
-
MMBtu
|
$(-23,008.0)
-
MMBtu
|
- | - | - | |
13 | 3.4159: Replace treated water with well / surface water | $10,867 | $27,400 | - | - | - | - | - | - |
$10,867
-
Tgal
|
|
TOTAL RECOMMENDED | $151,868 | $213,310 |
$12,451
155,659
kWh
|
$16,810
-
MMBtu
|
$43,281
-
MMBtu
|
$(-23,008.0)
-
MMBtu
|
$(-139.0)
-
gal
|
$91,607 |
$10,867
-
Tgal
|
||
TOTAL IMPLEMENTED | $8,116 | $29,822 |
$3,497
43,714
kWh
|
$4,619
-
MMBtu
|
- | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Other Gas Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs