ITAC Assessment: UM0045
ITAC logo
ITAC Assessment: UM0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Heavy Duty Flooring
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 49
Plant Area 105,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,125 3,256,741
kWh
Natural Gas $3,112 722
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,611

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $4,377 $730 $4,377
65,358
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,728 $18,135 $11,728
174,971
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,355 $1,000 $1,355
20,223
kWh
-
04 2.7221: Lower temperature during the winter season and vice-versa $4,611 $500 - $4,611
-
MMBtu
05 2.3212: Optimize plant power factor $9,291 $14,954 $9,291
-
kWh
-
TOTAL RECOMMENDED $31,362 $35,319 $26,751
260,552
kWh
$4,611
-
MMBtu
TOTAL IMPLEMENTED $4,611 $500 - $4,611
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs