Assessment Year | 1988 |
---|---|
Principal Product | FLUID MILK, FRUIT DRINKS |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 11,000
Tgal
|
Production Hrs. Annual | 3,640
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $158,248 | 2,842,028 |
kWh
|
$0.056 |
Natural Gas | $39,000 | 9,822 |
MMBtu
|
$3.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,999 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $860 | - | - |
$1,460
-
MMBtu
|
$(-600.0) | |
02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $457 | $275 | - |
$457
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $551 | $1,354 |
$316
6,155
kWh
|
$235
-
MMBtu
|
- | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $2,470 | - |
$2,470
60,961
kWh
|
- | - | |
05 | 2.2136: Install / repair insulation on steam lines | $715 | $146 | - |
$715
-
MMBtu
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $402 | - |
$402
9,965
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $226 | $571 |
$226
50,117
kWh
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $383 | - |
$383
6,741
kWh
|
- | - | |
09 | 2.7261: Install timers and/or thermostats | $529 | $129 |
$393
9,672
kWh
|
$136
-
MMBtu
|
- | |
10 | 2.7111: Reduce illumination to minimum necessary levels | $640 | $770 |
$640
15,826
kWh
|
- | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $121 | $85 |
$139
2,931
kWh
|
- | $(-18.0) | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,312 | $3,363 |
$2,505
61,841
kWh
|
- | $807 | |
13 | 2.2441: Preheat boiler makeup water with waste process heat | $333 | $1,770 | - |
$333
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $10,999 | $8,463 |
$7,474
224,209
kWh
|
$3,336
-
MMBtu
|
$189 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs