Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,007

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other rubber product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0998 #05 Y:2025 Optimize plant power factor $3,545 $19,221
GT0998 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $6,264 $4,206
GT0998 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,774 $1,850
GT0998 #02 Y:2025 Apply for tax-free status for energy purchases $734 $200
GT0998 #01 Y:2025 Eliminate or reduce compressed air usage $30,981 $1,000
WM0240 #05 Y:2025 Reduce the pressure of compressed air to the minimum required $1,748 -
WM0240 #04 Y:2025 Reduce space conditioning during non-working hours $1,825 -
WM0240 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,951 $2,250
WM0240 #02 Y:2025 Install vinyl strip / high speed / air curtain doors $3,119 $3,235
WM0240 #01 Y:2025 Optimize plant power factor $17,534 $48,125
SD0669 #08 Y:2025 Use properly designed and sized hvac equipment $21,106 $91,450
SD0669 #07 Y:2025 Install direct acting units in place of compressed air pressure system in safety system $19,984 $1,400
SD0669 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,220 $1,016
SD0669 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $14,398 $3,518
SD0669 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $8,099 $2,437
SD0669 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $1,779 -
SD0669 #02 Y:2025 Use battery storage for demand control $20,905 $894
SD0669 #01 Y:2025 Use solar heat to make electricty $298,549 $273,844
KS2437 #09 Y:2024 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $65,208 $627,000
KS2437 #08 Y:2024 Install / repair insulation on steam lines $1,546 $4,072