Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Crumb Rubber
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 70,000
ft2
Annual Production 157,711
ton
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,221,163 10,963,070
kWh
Electricity Fees $3,545 -
Natural Gas $12,373 1,492
MMBtu
Other Gas $866 1
MMBtu
TOTAL YEARLY COSTS $1,237,947
RECOMMENDED SAVINGS* $605,392 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Other Gas Savings Personnel Changes Savings
01 2.4238: Do not use compressed air for personal cooling $30,981 $1,000 $30,981
279,104
kWh
- - -
02 2.8121: Apply for tax-free status for energy purchases $734 $200 - - $734
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,774 $1,850 $5,674
51,121
kWh
- - $(-2,900.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,264 $4,206 $6,264
56,432
kWh
- - -
05 2.3212: Optimize plant power factor $3,545 $19,221 - $3,545 - -
06 2.9114: Use solar heat to make electricty $561,094 $3,319,567 $561,094
5,037,247
kWh
- - -
TOTAL RECOMMENDED $605,392 $3,346,044 $604,013
5,423,904
kWh
$3,545 $734
-
MMBtu
$(-2,900.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Other Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs