ITAC Assessment: WM0240
ITAC logo
ITAC Assessment: WM0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Tire Shred
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 2,500
ft2
Annual Production 60,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,080 6,225,948
kWh
Electricity Demand $154,584 19,003
kW-mo/yr
Electricity Fees $338,502 -
Natural Gas $9,106 873
MMBtu
Waste Disposal Costs
Water Usage $25,854 2,156
Tgal
TOTAL YEARLY COSTS $767,126
RECOMMENDED SAVINGS* $26,178 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $17,534 $48,125 - $17,534
-
kW-mo/yr
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $3,119 $3,235 - - $3,119
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,951 $2,250 $1,509
39,700
kWh
$443
-
kW-mo/yr
-
04 2.7224: Reduce space conditioning during non-working hours $1,825 - - - $1,825
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,748 - $1,238
32,585
kWh
$510
-
kW-mo/yr
-
TOTAL RECOMMENDED $26,178 $53,610 $2,747
72,285
kWh
$18,486
-
kW-mo/yr
$4,944
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs