ITAC Assessment: SD0669
ITAC logo
ITAC Assessment: SD0669
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Gloves
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 19,770
ft2
Annual Production 209,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $320,540 1,037,218
kWh
Electricity Demand $157,394 2,370
kW-mo/yr
Natural Gas $38,520 3,272
MMBtu
TOTAL YEARLY COSTS $516,454
RECOMMENDED SAVINGS* $387,039 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $298,549 $273,844 $156,277
505,750
kWh
$142,272
-
kW-mo/yr
02 2.3141: Use battery storage for demand control $20,905 $894 $(-2,113.6)
(-6,840)
kWh
$23,019
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,779 - $1,779
5,757
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,099 $2,437 $6,253
20,235
kWh
$1,846
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,398 $3,518 $11,116
35,974
kWh
$3,282
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,220 $1,016 $1,714
5,546
kWh
$506
-
kW-mo/yr
07 2.4223: Install direct acting units in place of compressed air pressure system in safety system $19,984 $1,400 $19,984
64,673
kWh
-
08 2.7233: Use properly designed and sized hvac equipment $21,106 $91,450 $11,587
37,497
kWh
$9,519
-
kW-mo/yr
TOTAL RECOMMENDED $387,039 $374,559 $206,595
668,592
kWh
$180,444
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs