ITAC Assessment: KS2437
ITAC logo
ITAC Assessment: KS2437
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Rubber Rollers
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 100,000
ft2
Annual Production 6,500
units
Production Hrs. Annual 3,060
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $370,157 2,900,296
kWh
Natural Gas $143,389 32,709
MMBtu
Waste Disposal Costs
Water Usage $30,869 3,385
Tgal
Water Disposal $37,947 3,385
Tgal
TOTAL YEARLY COSTS $582,362
RECOMMENDED SAVINGS* $174,439 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,199 $5,960 $7,199
56,244
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,218 $60 $1,218
9,514
kWh
- - -
03 2.2449: Recover heat from exhausted steam, hot air or hot water $771 $2,184 - $771
-
MMBtu
- -
04 2.8121: Apply for tax-free status for energy purchases $22,668 $1,600 - - $5,667 $17,001
05 2.7142: Utilize higher efficiency lamps and/or ballasts $18,870 $69,278 $18,870
147,418
kWh
- - -
06 2.9114: Use solar heat to make electricty $47,984 $340,586 $47,984
374,875
kWh
- - -
07 2.4133: Use most efficient type of electric motors $8,975 $88,610 $8,975
70,117
kWh
- - -
08 2.2136: Install / repair insulation on steam lines $1,546 $4,072 - $1,546
-
MMBtu
- -
09 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $65,208 $627,000 $78,336
612,000
kWh
$(-6,728.0)
-
MMBtu
$(-6,400.0) -
TOTAL RECOMMENDED $174,439 $1,139,350 $162,582
1,270,168
kWh
$(-4,411.0)
-
MMBtu
$(-733.0) $17,001
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs