238
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Polystyrene foam product manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UW2410 #07 Y:2024 | 07 | 2024 | Change procedures / equipment / operating conditions | $1,810 | $16,232 |
n/a
|
UW2410 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $64,748 | $539,875 |
n/a
|
UW2410 #05 Y:2024 | 05 | 2024 | Utilize higher efficiency lamps and/or ballasts | $9,253 | $17,069 |
n/a
|
UW2410 #04 Y:2024 | 04 | 2024 | Use optimum size and capacity equipment | $10,200 | $60,000 |
n/a
|
UW2410 #03 Y:2024 | 03 | 2024 | Install shelves / racks to utilize unused space | $131,806 | $610,500 |
n/a
|
UW2410 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,418 | $25,000 |
n/a
|
UW2410 #01 Y:2024 | 01 | 2024 | Install equipment to move product | $855,879 | $575,120 |
n/a
|
NL0082 #06 Y:2023 | 06 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $314 | $881 |
n/a
|
NL0082 #05 Y:2023 | 05 | 2023 | Utilize higher efficiency lamps and/or ballasts | $365 | $1,917 |
n/a
|
NL0082 #04 Y:2023 | 04 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,690 | $2,500 |
n/a
|
NL0082 #03 Y:2023 | 03 | 2023 | Eliminate or reduce compressed air usage | $2,917 | $6,850 |
n/a
|
NL0082 #02 Y:2023 | 02 | 2023 | Adjust / maintain fork lift trucks for most efficient operation | $14,674 | $80,927 |
n/a
|
NL0082 #01 Y:2023 | 01 | 2023 | Use or replace with energy efficient substitutes | $676,628 | $1,200,000 |
n/a
|
DL0192 #05 Y:2021 | 05 | 2021 | Install timers and/or thermostats | $2,042 | $175 | |
DL0192 #04 Y:2021 | 04 | 2021 | Use adjustable frequency drive or multiple speed motors on existing system | $1,082 | $11,000 | |
DL0192 #03 Y:2021 | 03 | 2021 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,016 | $1,500 | |
DL0192 #02 Y:2021 | 02 | 2021 | Utilize higher efficiency lamps and/or ballasts | $973 | $1,296 | |
DL0192 #01 Y:2021 | 01 | 2021 | Utilize higher efficiency lamps and/or ballasts | $1,986 | $7,760 | |
OR0736 #05 Y:2020 | 05 | 2020 | Use solar heat to make electricty | $17,948 | $212,663 | |
OR0736 #04 Y:2020 | 04 | 2020 | Utilize controls to operate equipment only when needed | $922 | $114 |