ITAC Assessment: DL0192
ITAC logo
ITAC Assessment: DL0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Thermal and Acoustic Insulation Components
NAICS 326140: Polystyrene Foam Product Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 85,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 4,700
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,392 813,142
kWh
Electricity Demand $13,844 2,385
kW-mo/yr
Electricity Fees $900 -
Natural Gas $38,949 4,500
MMBtu
Waste Disposal Costs
Water Usage $19,455 1,621
Tgal
TOTAL YEARLY COSTS $133,540
RECOMMENDED SAVINGS* $8,099 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,099

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,986 $7,760 $1,986
21,827
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $973 $1,296 $973
10,692
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,016 $1,500 $2,016
22,150
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,082 $11,000 $1,082
11,894
kWh
-
05 2.7261: Install timers and/or thermostats $2,042 $175 $675
7,420
kWh
$1,367
-
MMBtu
TOTAL RECOMMENDED $8,099 $21,731 $6,732
73,983
kWh
$1,367
-
MMBtu
TOTAL IMPLEMENTED $8,099 $21,731 $6,732
73,983
kWh
$1,367
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs