Assessment Year | 2021 |
---|---|
Principal Product | Thermal and Acoustic Insulation Components |
NAICS | 326140: Polystyrene Foam Product Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
85,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 4,700
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $60,392 | 813,142 |
kWh
|
$0.074 | |
Electricity Demand | $13,844 | 2,385 |
kW-mo/yr
|
$5.80 | |
Electricity Fees | $900 | - |
|
- | |
Natural Gas | $38,949 | 4,500 |
MMBtu
|
$8.66 | |
Waste Disposal Costs | |||||
Water Usage | $19,455 | 1,621 |
Tgal
|
$12.00 | |
TOTAL YEARLY COSTS | $133,540 | ||||
RECOMMENDED SAVINGS* | $8,099 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $8,099 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,986 | $7,760 |
$1,986
21,827
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $973 | $1,296 |
$973
10,692
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,016 | $1,500 |
$2,016
22,150
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,082 | $11,000 |
$1,082
11,894
kWh
|
- | |
05 | 2.7261: Install timers and/or thermostats | $2,042 | $175 |
$675
7,420
kWh
|
$1,367
-
MMBtu
|
|
TOTAL RECOMMENDED | $8,099 | $21,731 |
$6,732
73,983
kWh
|
$1,367
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,099 | $21,731 |
$6,732
73,983
kWh
|
$1,367
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs