ITAC Assessment: BS0017
ITAC logo
ITAC Assessment: BS0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 32,240
ft2
Annual Production 442
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,788 365,152
kWh
Electricity Demand $9,922 1,586
kW-mo/yr
Natural Gas $14,937 1,856
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,008 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,010

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $268 $182 $268
3,348
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $391 $977 $391
4,893
kWh
-
03 2.4112: Install soft-start to eliminate nuisance trips $1,029 $4,500 $1,029
12,858
kWh
-
04 2.7135: Install occupancy sensors $207 $48 $207
2,583
kWh
-
05 2.7492: Use proper thickness of insulation on building envelope $998 $1,134 - $998
-
MMBtu
06 2.6242: Minimize operation of equipment maintained in standby condition $2,115 $2,167 $2,115
26,436
kWh
-
TOTAL RECOMMENDED $5,008 $9,008 $4,010
50,118
kWh
$998
-
MMBtu
TOTAL IMPLEMENTED $4,010 $7,874 $4,010
50,118
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs