Assessment Year | 2013 |
---|---|
Principal Product | Boats |
NAICS | 336612: Boat Building |
SIC | 3732: Boat Building and Repairing |
Sales Range | $10 M to 50M |
# of Employees | 68 |
Plant Area |
32,240
ft2
|
Annual Production | 442
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $27,788 | 365,152 |
kWh
|
$0.076 |
Electricity Demand | $9,922 | 1,586 |
kW-mo/yr
|
$6.26 |
Natural Gas | $14,937 | 1,856 |
MMBtu
|
$8.05 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,008 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,010 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $268 | $182 |
$268
3,348
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $391 | $977 |
$391
4,893
kWh
|
- | |
03 | 2.4112: Install soft-start to eliminate nuisance trips | $1,029 | $4,500 |
$1,029
12,858
kWh
|
- | |
04 | 2.7135: Install occupancy sensors | $207 | $48 |
$207
2,583
kWh
|
- | |
05 | 2.7492: Use proper thickness of insulation on building envelope | $998 | $1,134 | - |
$998
-
MMBtu
|
|
06 | 2.6242: Minimize operation of equipment maintained in standby condition | $2,115 | $2,167 |
$2,115
26,436
kWh
|
- | |
TOTAL RECOMMENDED | $5,008 | $9,008 |
$4,010
50,118
kWh
|
$998
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,010 | $7,874 |
$4,010
50,118
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs