Assessment Year | 2024 |
---|---|
Principal Product | Polystyrene Foam Products |
NAICS | 326140: Polystyrene Foam Product Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $10 M to 50M |
# of Employees | 86 |
Plant Area |
152,359
ft2
|
Annual Production | 6,250,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $141,009 | 9,679,431 |
kWh
|
$0.015 |
Electricity Demand | $67,712 | 20,831 |
kW-mo/yr
|
$3.25 |
Electricity Fees | $15,808 | - |
|
- |
Natural Gas | $112,334 | 9,065 |
MMBtu
|
$12.39 |
TOTAL YEARLY COSTS | $336,863 | |||
RECOMMENDED SAVINGS* | $1,086,114 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 4.445: Install equipment to move product | $855,879 | $575,120 | - | - | $855,879 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,418 | $25,000 |
$9,515
651,744
kWh
|
$2,903
-
kW-mo/yr
|
- | |
03 | 4.515: Install shelves / racks to utilize unused space | $131,806 | $610,500 | - | - | $131,806 | |
04 | 2.4323: Use optimum size and capacity equipment | $10,200 | $60,000 |
$200
13,666
kWh
|
- | $10,000 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,253 | $17,069 |
$7,091
485,654
kWh
|
$2,162
-
kW-mo/yr
|
- | |
06 | 2.9114: Use solar heat to make electricty | $64,748 | $539,875 |
$15,990
1,095,224
kWh
|
$48,758
-
kW-mo/yr
|
- | |
07 | 3.1191: Change procedures / equipment / operating conditions | $1,810 | $16,232 |
$210
14,363
kWh
|
- | $1,600 | |
TOTAL RECOMMENDED | $1,086,114 | $1,843,796 |
$33,006
2,260,651
kWh
|
$53,823
-
kW-mo/yr
|
$999,285 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs