ITAC Assessment: UW2410
ITAC logo
ITAC Assessment: UW2410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Polystyrene Foam Products
NAICS 326140: Polystyrene Foam Product Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 86
Plant Area 152,359
ft2
Annual Production 6,250,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,009 9,679,431
kWh
Electricity Demand $67,712 20,831
kW-mo/yr
Electricity Fees $15,808 -
Natural Gas $112,334 9,065
MMBtu
TOTAL YEARLY COSTS $336,863
RECOMMENDED SAVINGS* $1,086,114 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 4.445: Install equipment to move product $855,879 $575,120 - - $855,879
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,418 $25,000 $9,515
651,744
kWh
$2,903
-
kW-mo/yr
-
03 4.515: Install shelves / racks to utilize unused space $131,806 $610,500 - - $131,806
04 2.4323: Use optimum size and capacity equipment $10,200 $60,000 $200
13,666
kWh
- $10,000
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,253 $17,069 $7,091
485,654
kWh
$2,162
-
kW-mo/yr
-
06 2.9114: Use solar heat to make electricty $64,748 $539,875 $15,990
1,095,224
kWh
$48,758
-
kW-mo/yr
-
07 3.1191: Change procedures / equipment / operating conditions $1,810 $16,232 $210
14,363
kWh
- $1,600
TOTAL RECOMMENDED $1,086,114 $1,843,796 $33,006
2,260,651
kWh
$53,823
-
kW-mo/yr
$999,285
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs