Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product precision instruments for primary and secondary standards, r
NAICS
n/a
SIC 3821: Laboratory Apparatus and Furniture
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 128,000
ft2
Annual Production 86
pieces
Production Hrs. Annual 2,008
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,261 1,798,066
kWh
Natural Gas $3,865 913
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,950 $12,850 $6,950
59,496
kWh
02 2.3212: Optimize plant power factor $3,640 $5,500 $3,640
-
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $210 $240 $210
7,327
kWh
TOTAL RECOMMENDED $10,800 $18,590 $10,800
66,823
kWh
TOTAL IMPLEMENTED $7,160 $13,090 $7,160
66,823
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs