ITAC Assessment: OR0736
ITAC logo
ITAC Assessment: OR0736
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Extruded polystyrene foam sheets
NAICS 326140: Polystyrene Foam Product Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 344,662
ft2
Annual Production 84,166
thousand feet
Production Hrs. Annual 7,800
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $340,723 5,774,965
kWh
Electricity Demand $58,543 11,003
kW-mo/yr
Electricity Fees $27,565 -
Natural Gas $43,071 5,185
MMBtu
LPG $5,195 340
MMBtu
TOTAL YEARLY COSTS $475,097
RECOMMENDED SAVINGS* $40,719 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,876

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4314: Use synthetic lubricant $17,895 $672 $14,887
252,320
kWh
$3,008
-
kW-mo/yr
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,946 $3,000 $2,451
41,535
kWh
$495
-
kW-mo/yr
03 2.4322: Use or replace with energy efficient substitutes $1,008 $1,549 $841
14,247
kWh
$167
-
kW-mo/yr
04 2.6231: Utilize controls to operate equipment only when needed $922 $114 $922
15,630
kWh
-
05 2.9114: Use solar heat to make electricty $17,948 $212,663 $17,948
231,523
kWh
-
TOTAL RECOMMENDED $40,719 $217,998 $37,049
555,255
kWh
$3,670
-
kW-mo/yr
TOTAL IMPLEMENTED $4,876 $4,663 $4,214
71,412
kWh
$662
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs