ITAC Assessment: TN0443
ITAC logo
ITAC Assessment: TN0443
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DENIM APPAREL
NAICS
n/a
SIC 2339: Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 178
Plant Area
n/a
Annual Production 48,000,000
pieces
Production Hrs. Annual 8,232
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,537 2,073,271
kWh
Natural Gas $363,437 55,394
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $14,982 $1,500 - $14,982
-
MMBtu
02 2.2515: Use optimum thickness insulation $4,316 $630 - $4,316
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,033 $6,300 $9,033
184,349
kWh
-
04 2.2163: Use minimum steam operating pressure $1,472 $500 - $1,472
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $747 $390 $747
15,240
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,751 $765 $1,751
34,877
kWh
-
TOTAL RECOMMENDED $32,301 $10,085 $11,531
234,466
kWh
$20,770
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs