Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

238

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Polystyrene foam product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UW2410 #07 Y:2024 Change procedures / equipment / operating conditions $1,810 $16,232
UW2410 #06 Y:2024 Use solar heat to make electricty $64,748 $539,875
UW2410 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $9,253 $17,069
UW2410 #04 Y:2024 Use optimum size and capacity equipment $10,200 $60,000
UW2410 #03 Y:2024 Install shelves / racks to utilize unused space $131,806 $610,500
UW2410 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $12,418 $25,000
UW2410 #01 Y:2024 Install equipment to move product $855,879 $575,120
NL0082 #06 Y:2023 Utilize energy-efficient belts and other improved mechanisms $314 $881
NL0082 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $365 $1,917
NL0082 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,690 $2,500
NL0082 #03 Y:2023 Eliminate or reduce compressed air usage $2,917 $6,850
NL0082 #02 Y:2023 Adjust / maintain fork lift trucks for most efficient operation $14,674 $80,927
NL0082 #01 Y:2023 Use or replace with energy efficient substitutes $676,628 $1,200,000
DL0192 #05 Y:2021 Install timers and/or thermostats $2,042 $175
DL0192 #04 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $1,082 $11,000
DL0192 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,016 $1,500
DL0192 #02 Y:2021 Utilize higher efficiency lamps and/or ballasts $973 $1,296
DL0192 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,986 $7,760
OR0736 #05 Y:2020 Use solar heat to make electricty $17,948 $212,663
OR0736 #04 Y:2020 Utilize controls to operate equipment only when needed $922 $114