Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

440

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics pipe and pipe fitting manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0290 #08 Y:2024 Install occupancy sensors $348 $452
UA0290 #07 Y:2024 Utilize energy-efficient belts and other improved mechanisms $224 $224
UA0290 #06 Y:2024 Preheat boiler makeup water with waste process heat $10,563 $56,271
UA0290 #05 Y:2024 Eliminate or reduce compressed air usage $5,137 $2,005
UA0290 #04 Y:2024 Recover waste heat from equipment $6,760 $8,397
UA0290 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,530 $5,091
UA0290 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $2,200 $500
UA0290 #01 Y:2024 Use solar heat to make electricty $81,410 $555,652
UF0622 #12 Y:2024 Modify facility to avoid excess maintenance costs $3,200 $3,200
UF0622 #11 Y:2024 Improve space comfort conditioning $30,240 $788
UF0622 #10 Y:2024 Level one – add communication using iiot devices to existing control system to modify operations $46,005 -
UF0622 #09 Y:2024 Level zero – install control systems for existing equipment $16,512 $11,225
UF0622 #08 Y:2024 Utilize energy-efficient belts and other improved mechanisms $5,035 -
UF0622 #07 Y:2024 Minimize condenser cooling water temperature $5,875 $6,148
UF0622 #06 Y:2024 Utilize controls to operate equipment only when needed $5,789 $25,360
UF0622 #05 Y:2024 Upgrade obsolete equipment $10,345 $46,500
UF0622 #04 Y:2024 Use most efficient type of electric motors $10,345 $12,420
UF0622 #03 Y:2024 Insulate bare equipment $13,853 $3,888
UF0622 #02 Y:2024 Use demand controller or load shedder $43,371 $52,879
UF0622 #01 Y:2024 Use solar heat to make electricty $41,219 $322,608