ITAC Assessment: UA0290
ITAC logo
ITAC Assessment: UA0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Infiltrator Systems
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $5
M
to 10
M
# of Employees 22
Plant Area 42,215
ft2
Annual Production 14,436
thousand feet
Production Hrs. Annual 4,800
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $128,433 1,431,702
kWh
Electricity Demand $29,442 6,173
kW-mo/yr
Electricity Fees $32,954 -
Natural Gas $174,433 11,562
MMBtu
TOTAL YEARLY COSTS $365,262
RECOMMENDED SAVINGS* $108,172 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $81,410 $555,652 $66,372
739,933
kWh
$981
-
kW-mo/yr
$14,057 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,200 $500 $1,608
17,927
kWh
$212
-
kW-mo/yr
$380 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,530 $5,091 $1,175
13,098
kWh
$91
-
kW-mo/yr
$264 -
04 2.2437: Recover waste heat from equipment $6,760 $8,397 - - - $6,760
-
MMBtu
05 2.4239: Eliminate or reduce compressed air usage $5,137 $2,005 $3,952
44,055
kWh
$298
-
kW-mo/yr
$887 -
06 2.2441: Preheat boiler makeup water with waste process heat $10,563 $56,271 - - - $10,563
-
MMBtu
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $224 $224 $140
1,558
kWh
$45
-
kW-mo/yr
$39 -
08 2.7135: Install occupancy sensors $348 $452 $288
3,212
kWh
- $60 -
TOTAL RECOMMENDED $108,172 $628,592 $73,535
819,783
kWh
$1,627
-
kW-mo/yr
$15,687 $17,323
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs