ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
CI0043 #08 Y:2024 | 08 | 2024 | Recharge batteries on during off-peak demand periods | $2,248 | $800 |
n/a
|
CI0043 #07 Y:2024 | 07 | 2024 | Use photocell controls | $2,912 | $8,100 |
n/a
|
CI0043 #06 Y:2024 | 06 | 2024 | Use most efficient type of electric motors | $3,043 | $1,380 |
n/a
|
CI0043 #05 Y:2024 | 05 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,106 | $23,794 |
n/a
|
CI0043 #04 Y:2024 | 04 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $14,483 | $12,000 |
n/a
|
CI0043 #03 Y:2024 | 03 | 2024 | Install occupancy sensors | $18,838 | $12,100 |
n/a
|
CI0043 #02 Y:2024 | 02 | 2024 | Utilize higher efficiency lamps and/or ballasts | $18,970 | $7,350 |
n/a
|
CI0043 #01 Y:2024 | 01 | 2024 | Use optimum size and capacity equipment | $143,742 | $300,000 |
n/a
|
UL2306 #05 Y:2023 | 05 | 2023 | Optimize plant power factor | $103,804 | $14,859 | |
UL2306 #04 Y:2023 | 04 | 2023 | Use solar heat to make electricty | $30,055 | $314,019 | |
UL2306 #03 Y:2023 | 03 | 2023 | Size electric motors for peak operating efficiency | $8,595 | $12,891 | |
UL2306 #02 Y:2023 | 02 | 2023 | Lower temperature during the winter season and vice-versa | $336 | $600 | |
UL2306 #01 Y:2023 | 01 | 2023 | Install occupancy sensors | $1,019 | - | |
CC0018 #06 Y:2023 | 06 | 2023 | Replace fossil fuel equipment with electrical equipment | $95,279 | $350,000 |
n/a
|
CC0018 #05 Y:2023 | 05 | 2023 | Use cooling tower water instead of refrigeration | $16,265 | $70,000 |
n/a
|
CC0018 #04 Y:2023 | 04 | 2023 | Reduce the pressure of compressed air to the minimum required | $2,300 | - |
n/a
|
CC0018 #03 Y:2023 | 03 | 2023 | Eliminate or reduce compressed air usage | $5,158 | $10,000 |
n/a
|
CC0018 #02 Y:2023 | 02 | 2023 | Recover waste heat from equipment | $31,506 | $10,000 |
n/a
|
CC0018 #01 Y:2023 | 01 | 2023 | Insulate feedwater tank | $2,497 | $500 |
n/a
|
WM0195 #09 Y:2023 | 09 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,142 | $1,715 |