262
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | Plastics packaging film and sheet (including laminated) manufacturing | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UL2306 #05 Y:2023 | 05 | 2023 | Optimize plant power factor | $103,804 | $14,859 | |
UL2306 #04 Y:2023 | 04 | 2023 | Use solar heat to make electricty | $30,055 | $314,019 | |
UL2306 #03 Y:2023 | 03 | 2023 | Size electric motors for peak operating efficiency | $8,595 | $12,891 | |
UL2306 #02 Y:2023 | 02 | 2023 | Lower temperature during the winter season and vice-versa | $336 | $600 | |
UL2306 #01 Y:2023 | 01 | 2023 | Install occupancy sensors | $1,019 | - | |
CC0018 #06 Y:2023 | 06 | 2023 | Replace fossil fuel equipment with electrical equipment | $95,279 | $350,000 |
n/a
|
CC0018 #05 Y:2023 | 05 | 2023 | Use cooling tower water instead of refrigeration | $16,265 | $70,000 |
n/a
|
CC0018 #04 Y:2023 | 04 | 2023 | Reduce the pressure of compressed air to the minimum required | $2,300 | - |
n/a
|
CC0018 #03 Y:2023 | 03 | 2023 | Eliminate or reduce compressed air usage | $5,158 | $10,000 |
n/a
|
CC0018 #02 Y:2023 | 02 | 2023 | Recover waste heat from equipment | $31,506 | $10,000 |
n/a
|
CC0018 #01 Y:2023 | 01 | 2023 | Insulate feedwater tank | $2,497 | $500 |
n/a
|
WM0195 #09 Y:2023 | 09 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,142 | $1,715 | |
WM0195 #08 Y:2023 | 08 | 2023 | Install or upgrade insulation on hvac distribution systems | $1,986 | $2,700 | |
WM0195 #07 Y:2023 | 07 | 2023 | Install occupancy sensors | $1,997 | $1,000 | |
WM0195 #06 Y:2023 | 06 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $2,381 | $700 | |
WM0195 #05 Y:2023 | 05 | 2023 | Pay bills on time to avoid late fees | $2,687 | - | |
WM0195 #04 Y:2023 | 04 | 2023 | Reschedule plant operations or reduce load to avoid peaks | $4,436 | $3,735 | |
WM0195 #03 Y:2023 | 03 | 2023 | Clean and maintain refrigerant condensers and towers | $5,128 | $1,700 | |
WM0195 #02 Y:2023 | 02 | 2023 | Use radiant heater for spot heating | $15,091 | $13,400 | |
WM0195 #01 Y:2023 | 01 | 2023 | Utilize higher efficiency lamps and/or ballasts | $15,725 | $13,127 |