Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

262

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics packaging film and sheet (including laminated) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2306 #05 Y:2023 Optimize plant power factor $103,804 $14,859
UL2306 #04 Y:2023 Use solar heat to make electricty $30,055 $314,019
UL2306 #03 Y:2023 Size electric motors for peak operating efficiency $8,595 $12,891
UL2306 #02 Y:2023 Lower temperature during the winter season and vice-versa $336 $600
UL2306 #01 Y:2023 Install occupancy sensors $1,019 -
CC0018 #06 Y:2023 Replace fossil fuel equipment with electrical equipment $95,279 $350,000
CC0018 #05 Y:2023 Use cooling tower water instead of refrigeration $16,265 $70,000
CC0018 #04 Y:2023 Reduce the pressure of compressed air to the minimum required $2,300 -
CC0018 #03 Y:2023 Eliminate or reduce compressed air usage $5,158 $10,000
CC0018 #02 Y:2023 Recover waste heat from equipment $31,506 $10,000
CC0018 #01 Y:2023 Insulate feedwater tank $2,497 $500
WM0195 #09 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,142 $1,715
WM0195 #08 Y:2023 Install or upgrade insulation on hvac distribution systems $1,986 $2,700
WM0195 #07 Y:2023 Install occupancy sensors $1,997 $1,000
WM0195 #06 Y:2023 Utilize energy-efficient belts and other improved mechanisms $2,381 $700
WM0195 #05 Y:2023 Pay bills on time to avoid late fees $2,687 -
WM0195 #04 Y:2023 Reschedule plant operations or reduce load to avoid peaks $4,436 $3,735
WM0195 #03 Y:2023 Clean and maintain refrigerant condensers and towers $5,128 $1,700
WM0195 #02 Y:2023 Use radiant heater for spot heating $15,091 $13,400
WM0195 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $15,725 $13,127