Assessment Year | 2023 |
---|---|
Principal Product | Bubble Wrap, Instapak Film, Jiffylite |
NAICS | 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $50 M to 100M |
# of Employees | 140 |
Plant Area |
164,000
ft2
|
Annual Production | 26,455,471
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $503,452 | 13,392,237 |
kWh
|
$0.038 |
Electricity Demand | $287,019 | 26,129 |
kW-mo/yr
|
$10.98 |
Electricity Fees | $10,854 | - |
|
- |
Fuel Oil #2 | $240,165 | 8,248 |
MMBtu
|
$29.12 |
TOTAL YEARLY COSTS | $1,041,490 | |||
RECOMMENDED SAVINGS* | $153,005 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.2123: Insulate feedwater tank | $2,497 | $500 | - | - |
$2,497
-
MMBtu
|
|
02 | 2.2437: Recover waste heat from equipment | $31,506 | $10,000 |
$(-994.0)
(-26,162)
kWh
|
$(-491.0)
-
kW-mo/yr
|
$32,991
-
MMBtu
|
|
03 | 2.4239: Eliminate or reduce compressed air usage | $5,158 | $10,000 |
$3,695
97,236
kWh
|
$1,463
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,300 | - |
$1,648
43,362
kWh
|
$652
-
kW-mo/yr
|
- | |
05 | 2.2612: Use cooling tower water instead of refrigeration | $16,265 | $70,000 |
$16,265
428,025
kWh
|
- | - | |
06 | 2.1321: Replace fossil fuel equipment with electrical equipment | $95,279 | $350,000 |
$(-73,483.9)
(-1,933,787)
kWh
|
$(-71,402.5)
-
kW-mo/yr
|
$240,165
-
MMBtu
|
|
TOTAL RECOMMENDED | $153,005 | $440,500 |
$(-52,869.9)
(-1,391,326)
kWh
|
$(-69,778.5)
-
kW-mo/yr
|
$275,653
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs