Assessment Year | 2008 |
---|---|
Principal Product | Aluminum automotive components |
NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
SIC | 3363: Aluminum Die-Castings |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
110,000
ft2
|
Annual Production | 2,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,018,125 | 20,103,300 |
kWh
|
$0.051 |
Electricity Demand | $454,217 | 38,021 |
kW-mo/yr
|
$11.95 |
Electricity Fees | $3,643 | - |
|
- |
Natural Gas | $1,598,505 | 141,103 |
MMBtu
|
$11.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $134,169 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $67,300 | $63,800 |
$39,500
760,000
kWh
|
$19,000
-
kW-mo/yr
|
$8,800 | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,980 | $6,600 |
$11,800
224,640
kWh
|
$5,600
-
kW-mo/yr
|
- | - | $580 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,430 | $3,640 |
$560
11,180
kWh
|
$290
-
kW-mo/yr
|
- | - | $580 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $190 | $590 |
$140
2,730
kWh
|
$50
-
kW-mo/yr
|
- | - | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $16,119 | $55,000 |
$10,761
214,157
kWh
|
$5,358
-
kW-mo/yr
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,000 | $4,900 |
$5,000
1,300
kWh
|
- | - | - | - | |
07 | 2.2511: Insulate bare equipment | $25,000 | $1,000 | - | - | - |
$25,000
-
MMBtu
|
- | |
08 | 2.3212: Optimize plant power factor | $1,150 | $6,000 | - | - | $1,150 | - | - | |
TOTAL RECOMMENDED | $134,169 | $141,530 |
$67,761
1,214,007
kWh
|
$30,298
-
kW-mo/yr
|
$9,950 |
$25,000
-
MMBtu
|
$1,160 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs