Assessment Year | 1997 |
---|---|
Principal Product | Furniture Components |
NAICS |
n/a
|
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
186,000
ft2
|
Annual Production | 15,000
thousand feet
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $167,736 | 3,077,081 |
kWh
|
$0.055 |
Electricity Demand | $110,850 | 6,518 |
kW-mo/yr
|
$17.01 |
Electricity Fees | $10,362 | - |
|
- |
LPG | $7,498 | 1,004 |
MMBtu
|
$7.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $322,504 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,073 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 4.512: Condense operation into one building | $152,949 | $49,000 | - | - | - | - | - | - | $52,949 | - | $100,000 | |
02 | 4.112: Replace old machine with new automatic multi-station tool | $6,290 | $18,100 | - | - | - | - | $990 | - | $5,300 | - | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $13,564 | $12,000 |
$(-1,469.0)
(-31,067)
kWh
|
$(-1,467.0)
-
kW-mo/yr
|
- | - | - | - | - | $16,500 | - | |
04 | 2.1221: Replace obsolete burners with more efficient ones | $6,974 | $17,620 |
$(-3,260.0)
(-68,875)
kWh
|
$(-1,766.0)
-
kW-mo/yr
|
- |
$12,000
-
lb
|
- | - | - | - | - | |
05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,042 | $5,200 | - | - | - |
$2,262
-
lb
|
- | $780 | $(-1,000.0) | - | - | |
06 | 2.3411: Replace electric motors with back pressure steam turbines and use exhaust steam for process heat | $33,895 | $56,800 |
$20,927
443,142
kWh
|
$12,968
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
07 | 2.3192: Use fossil fuel powered generator during peak demand periods | $66,010 | $220,000 | - |
$51,740
-
kW-mo/yr
|
- | - | - | $22,420 | $(-8,150.0) | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $962 | $2,400 |
$557
9,965
kWh
|
$405
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $888 | $1,314 |
$548
11,723
kWh
|
$340
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
10 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $35,268 | $9,150 |
$23,241
374,267
kWh
|
$23,957
-
kW-mo/yr
|
$(-11,930.0)
-
MMBtu
|
- | - | - | - | - | - | |
11 | 2.7131: Add area lighting switches | $3,197 | $2,420 |
$3,197
67,702
kWh
|
- | - | - | - | - | - | - | - | |
12 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $143 | $180 |
$87
1,758
kWh
|
$56
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
13 | 2.4239: Eliminate or reduce compressed air usage | $322 | $240 |
$198
4,103
kWh
|
$124
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
TOTAL RECOMMENDED | $322,504 | $394,424 |
$44,026
812,718
kWh
|
$86,357
-
kW-mo/yr
|
$(-11,930.0)
-
MMBtu
|
$14,262
-
lb
|
$990 | $23,200 | $49,099 | $16,500 | $100,000 | ||
TOTAL IMPLEMENTED | $3,073 | $6,694 |
$635
13,481
kWh
|
$396
-
kW-mo/yr
|
- |
$2,262
-
lb
|
- | $780 | $(-1,000.0) | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs