Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product food service equipment
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 210,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 4,250
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,696 2,341,442
kWh
Electricity Demand $55,251 6,268
kW-mo/yr
Electricity Fees $677 -
Natural Gas $48,288 13,744
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.5315: Lease / purchase baler; sell cardboard to recycler $12,310 $8,000 - - - - $12,310
-
lb
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,050 $21,648 $3,068
141,559
kWh
$3,982
-
kW-mo/yr
- - - - - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,340 $10,650 $3,400
156,800
kWh
$8,290
-
kW-mo/yr
$(-2,350.0)
-
MMBtu
- - - - -
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $4,480 $1,000 - - - - - $1,710
-
lb
- $2,770
05 2.4322: Use or replace with energy efficient substitutes $3,060 $33,280 $930
42,790
kWh
$2,130
-
kW-mo/yr
- - - - - -
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,750 $1,800 - - $2,750
-
MMBtu
- - - - -
07 2.4239: Eliminate or reduce compressed air usage $1,540 $8,500 $800
36,928
kWh
$740
-
kW-mo/yr
- - - - - -
08 3.8125: Remove rollers from the machines and clean in a closed solvent cleaner $1,340 $1,000 - - - $680
-
gal
- - $330 $330
09 2.1233: Analyze flue gas for proper air/fuel ratio $1,220 $1,500 - - $1,220
-
MMBtu
- - - - -
10 3.8132: Use less toxic and volatile solvent substitutes $220 $1,170 - - - $600
-
gal
- - - $(-380.0)
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $210 $300 $100
4,396
kWh
$110
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $43,520 $88,848 $8,298
382,473
kWh
$15,252
-
kW-mo/yr
$1,620
-
MMBtu
$1,280
-
gal
$12,310
-
lb
$1,710
-
lb
$330 $2,720
TOTAL IMPLEMENTED $18,220 $10,800 $100
4,396
kWh
$110
-
kW-mo/yr
$1,220
-
MMBtu
- $12,310
-
lb
$1,710
-
lb
- $2,770
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings