ITAC Assessment: GT0670
ITAC logo
ITAC Assessment: GT0670
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product carpet
NAICS
n/a
SIC 2273: Carpets and Rugs
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 180,000
ft2
Annual Production 22,820
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,922 3,092,028
kWh
Electricity Demand $166,298 11,143
kW-mo/yr
Electricity Fees $10,221 -
Natural Gas $50,096 14,252
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $150,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $92,204

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.8112: Combine utility meters $512 - - - - - $512 - -
02 2.8114: Change rate schedules or other changes in utility service $36,226 - - - - - $36,226 - -
03 2.8113: Purchase gas directly from a contract gas supplier $370 - - - - - $370 - -
04 2.1123: Install automatic stack damper $3,388 $750 - - - $3,388
-
MMBtu
- - -
05 2.4225: Install common header on compressors $30,991 $5,250 $905
36,049
kWh
$28,332
-
kW-mo/yr
$1,754 - - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $10,078 $15,000 $4,685
185,815
kWh
$4,887
-
kW-mo/yr
$506 - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $7,869 $28,628 $2,477
98,183
kWh
$4,937
-
kW-mo/yr
$455 - - - -
08 2.4133: Use most efficient type of electric motors $8,397 $64,899 $3,719
147,714
kWh
$4,203
-
kW-mo/yr
$475 - - - -
09 3.5313: Increase amount of waste recovered for resale $6,000 $4,000 - - - - - $6,000 -
10 4.454: Modify startup/shutdown times $46,957 - $11,843
469,812
kWh
- $711 $10,778
-
MMBtu
- - $23,625
TOTAL RECOMMENDED $150,788 $118,527 $23,629
937,573
kWh
$42,359
-
kW-mo/yr
$3,901 $14,166
-
MMBtu
$37,108 $6,000 $23,625
TOTAL IMPLEMENTED $92,204 $89,149 $9,309
369,578
kWh
$37,422
-
kW-mo/yr
$2,735 - $36,738 $6,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs