ITAC Assessment: UL2306
ITAC logo
ITAC Assessment: UL2306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Packaging Foam
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,938 3,701,520
kWh
Electricity Demand $167,050 7,427
kW-mo/yr
Electricity Fees $63,950 -
Natural Gas $79,464 6,482
MMBtu
TOTAL YEARLY COSTS $416,402
RECOMMENDED SAVINGS* $143,809 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $336

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $1,019 - $1,019
35,615
kWh
- - -
02 2.7221: Lower temperature during the winter season and vice-versa $336 $600 $95
3,341
kWh
- - $241
-
MMBtu
03 2.4131: Size electric motors for peak operating efficiency $8,595 $12,891 - - $8,595 -
04 2.9114: Use solar heat to make electricty $30,055 $314,019 $11,730
409,837
kWh
$18,325
-
kW-mo/yr
- -
05 2.3212: Optimize plant power factor $103,804 $14,859 - - $103,804 -
TOTAL RECOMMENDED $143,809 $342,369 $12,844
448,793
kWh
$18,325
-
kW-mo/yr
$112,399 $241
-
MMBtu
TOTAL IMPLEMENTED $336 $600 $95
3,341
kWh
- - $241
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs