ITAC Assessment: TR0050
ITAC logo
ITAC Assessment: TR0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Industrial coatings for corrosion protection
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 64
Plant Area 100,000
ft2
Annual Production 24,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $172,569 3,162,054
kWh
Electricity Demand $103,441 10,063
kW-mo/yr
TOTAL YEARLY COSTS $276,010
RECOMMENDED SAVINGS* $73,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,691 $11,284 $4,997
90,854
kWh
$2,694
-
kW-mo/yr
-
02 2.9114: Use solar heat to make electricty $8,056 $79,654 $5,901
107,289
kWh
$2,155
-
kW-mo/yr
-
03 2.8121: Apply for tax-free status for energy purchases $4,636 $2,500 - - $4,636
04 2.4322: Use or replace with energy efficient substitutes $47,772 $272,678 $32,846
597,191
kWh
$14,927
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $5,139 $37,400 $4,092
74,396
kWh
$1,047
-
kW-mo/yr
-
TOTAL RECOMMENDED $73,294 $403,516 $47,835
869,730
kWh
$20,823
-
kW-mo/yr
$4,636
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs