ITAC Assessment: TT0194
ITAC logo
ITAC Assessment: TT0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product sunscreen, mouth antiseptic
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 190
Plant Area 120,000
ft2
Annual Production 8,600,000
units
Production Hrs. Annual 4,800
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,688 2,285,736
kWh
Electricity Demand $65,550 5,472
kW-mo/yr
Natural Gas $26,282 4,316
MMBtu
Waste Disposal Costs
Water Usage $12,573 4,522,600
Tgal
Water Disposal $26,160 4,523
Tgal
TOTAL YEARLY COSTS $276,253
RECOMMENDED SAVINGS* $29,959 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,040 $34,731 $12,549
196,983
kWh
$491
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $6,861 $25 $6,861
107,712
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,250 $3,050 $4,250
66,720
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,281 $3,000 $2,232
35,040
kWh
$1,049
-
kW-mo/yr
-
05 4.812: Apply for investment incentives $1,314 $20 - - $1,314
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,213 $94 $825
12,950
kWh
$388
-
kW-mo/yr
-
TOTAL RECOMMENDED $29,959 $40,920 $26,717
419,405
kWh
$1,928
-
kW-mo/yr
$1,314
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs