ITAC Assessment: CM1015
ITAC logo
ITAC Assessment: CM1015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Custom Corrugated Cardboard Products
NAICS 322211: Corrugated and Solid Fiber Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area 141,000
ft2
Annual Production 100,000
thousand feet
Production Hrs. Annual 6,250
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,603 4,459,174
kWh
Electricity Demand $210,713 10,971
kW-mo/yr
Electricity Fees $63,614 -
Natural Gas $321,676 32,339
MMBtu
TOTAL YEARLY COSTS $806,606
RECOMMENDED SAVINGS* $198,383 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,136

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $139,944 $1,455,428 $124,589
2,639,603
kWh
$15,355
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $17,380 $23,925 $9,296
196,809
kWh
$8,084
-
kW-mo/yr
- -
03 2.8121: Apply for tax-free status for energy purchases $30,725 $8,000 - - - $30,725
04 2.1224: Replace boiler $9,756 $43,140 - - $9,756
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $578 $1,310 - - $578
-
MMBtu
-
TOTAL RECOMMENDED $198,383 $1,531,803 $133,885
2,836,412
kWh
$23,439
-
kW-mo/yr
$10,334
-
MMBtu
$30,725
TOTAL IMPLEMENTED $27,136 $67,065 $9,296
196,809
kWh
$8,084
-
kW-mo/yr
$9,756
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs