ITAC Assessment: UF0565
ITAC logo
ITAC Assessment: UF0565
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 14
Plant Area 53,721
ft2
Annual Production 1,896,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $386,572 8,173,800
kWh
Electricity Demand $93,051 15,402
kW-mo/yr
Electricity Fees $47,361 -
TOTAL YEARLY COSTS $526,984
RECOMMENDED SAVINGS* $746,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,351

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings By-product Production Savings
01 2.1336: Install equipment to utilize waste fuel $124,268 $90,000 $105,638
2,247,626
kWh
$18,630
-
kW-mo/yr
- - - -
02 2.4323: Use optimum size and capacity equipment $120,536 $84,600 $93,061
1,980,014
kWh
$27,475
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $52,797 $9,223 $46,397
987,169
kWh
$6,400
-
kW-mo/yr
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,569 $48,945 $32,569
692,963
kWh
- - - - -
05 2.6231: Utilize controls to operate equipment only when needed $29,289 - $29,289
623,165
kWh
- - - - -
06 2.7135: Install occupancy sensors $2,587 $12,332 $2,587
55,041
kWh
- - - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,574 - $1,107
23,563
kWh
- $225 $242 - -
08 4.122: Develop standard procedures to improve internal yields $381,639 $1,857,208 $(-5,147.0)
(-109,500)
kWh
$(-906.0)
-
kW-mo/yr
- $304,492 - $83,200
09 4.662: Level one – add communication using iiot devices to existing control system to modify operations $1,621 - - - - - $1,621 -
TOTAL RECOMMENDED $746,880 $2,102,308 $305,501
6,500,041
kWh
$51,599
-
kW-mo/yr
$225 $304,734 $1,621 $83,200
TOTAL IMPLEMENTED $38,351 $61,277 $36,263
771,567
kWh
- $225 $242 $1,621 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs