Assessment Year | 2021 |
---|---|
Principal Product | Wastewater Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 14 |
Plant Area |
53,721
ft2
|
Annual Production | 1,896,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $386,572 | 8,173,800 |
kWh
|
$0.047 |
Electricity Demand | $93,051 | 15,402 |
kW-mo/yr
|
$6.04 |
Electricity Fees | $47,361 | - |
|
- |
TOTAL YEARLY COSTS | $526,984 | |||
RECOMMENDED SAVINGS* | $746,880 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,351 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings | Primary Product Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1336: Install equipment to utilize waste fuel | $124,268 | $90,000 |
$105,638
2,247,626
kWh
|
$18,630
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4323: Use optimum size and capacity equipment | $120,536 | $84,600 |
$93,061
1,980,014
kWh
|
$27,475
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $52,797 | $9,223 |
$46,397
987,169
kWh
|
$6,400
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $32,569 | $48,945 |
$32,569
692,963
kWh
|
- | - | - | - | - | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $29,289 | - |
$29,289
623,165
kWh
|
- | - | - | - | - | |
06 | 2.7135: Install occupancy sensors | $2,587 | $12,332 |
$2,587
55,041
kWh
|
- | - | - | - | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,574 | - |
$1,107
23,563
kWh
|
- | $225 | $242 | - | - | |
08 | 4.122: Develop standard procedures to improve internal yields | $381,639 | $1,857,208 |
$(-5,147.0)
(-109,500)
kWh
|
$(-906.0)
-
kW-mo/yr
|
- | $304,492 | - | $83,200 | |
09 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $1,621 | - | - | - | - | - | $1,621 | - | |
TOTAL RECOMMENDED | $746,880 | $2,102,308 |
$305,501
6,500,041
kWh
|
$51,599
-
kW-mo/yr
|
$225 | $304,734 | $1,621 | $83,200 | ||
TOTAL IMPLEMENTED | $38,351 | $61,277 |
$36,263
771,567
kWh
|
- | $225 | $242 | $1,621 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings | Primary Product Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs