Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

334

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Plastics bag and pouch manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0031 #04 Y:2024 Replace hydraulic / pneumatic equipment with electric equipment $11,204 $2,890
SJ0031 #03 Y:2024 Turn off equipment when not in use $25,779 -
SJ0031 #02 Y:2024 Eliminate or reduce compressed air usage $61,665 $21,632
SJ0031 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $3,602 $4,651
MU0053 #12 Y:2024 Use proper thickness of insulation on building envelope $210 $546
MU0053 #11 Y:2024 Install timers and/or thermostats $473 $140
MU0053 #10 Y:2024 Improve air circulation with destratification fans / other methods $16,560 $17,565
MU0053 #09 Y:2024 Lower temperature during the winter season and vice-versa $90 -
MU0053 #08 Y:2024 Install occupancy sensors $865 $512
MU0053 #07 Y:2024 Make a practice of turning off lights when not needed $1,119 -
MU0053 #06 Y:2024 Reduce illumination to minimum necessary levels $955 -
MU0053 #05 Y:2024 Install timers and/or thermostats $7,196 $1,904
MU0053 #04 Y:2024 Use or replace with energy efficient substitutes $79,472 $58,598
MU0053 #03 Y:2024 Use or replace with energy efficient substitutes $1,429 $4,900
MU0053 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $439 $51
MU0053 #01 Y:2024 Install / repair insulation on steam lines $456 $1,958
WV0658 #09 Y:2024 Analyze flue gas for proper air/fuel ratio $1,325 $952
WV0658 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,674 $10,167
WV0658 #07 Y:2024 Utilize energy-efficient belts and other improved mechanisms $5,056 $7,004
WV0658 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $7,787 $900