ITAC Assessment: TR0071
ITAC logo
ITAC Assessment: TR0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product 165
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 60,000
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 6,160
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,794 379,064
kWh
Electricity Demand $12,159 963
kW-mo/yr
Electricity Fees $1,136 -
TOTAL YEARLY COSTS $42,089
RECOMMENDED SAVINGS* $214,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,011 $1,887 $3,238
42,630
kWh
$773
-
kW-mo/yr
02 2.4322: Use or replace with energy efficient substitutes $20,551 $37,400 $16,724
220,124
kWh
$3,827
-
kW-mo/yr
03 2.4322: Use or replace with energy efficient substitutes $63,581 $272,678 $45,337
596,860
kWh
$18,243
-
kW-mo/yr
04 2.9114: Use solar heat to make electricty $126,645 $481,160 $98,814
1,300,873
kWh
$27,831
-
kW-mo/yr
TOTAL RECOMMENDED $214,788 $793,125 $164,114
2,160,487
kWh
$50,674
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs