| Assessment Year | 2025 |
|---|---|
| Principal Product | digitally printed bags |
| NAICS | 326111: Plastics Bag and Pouch Manufacturing |
| SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
91,000
ft2
|
| Annual Production | 5,500,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $112,037 | 2,084,305 |
kWh
|
$0.054 | |
| Electricity Demand | $79,264 | 6,497 |
kW-mo/yr
|
$12.20 | |
| Electricity Fees | $14,902 | - |
|
- | |
| Natural Gas | $5,327 | 833 |
MMBtu
|
$6.39 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,466 | 324 |
Tgal
|
$10.69 | |
| TOTAL YEARLY COSTS | $214,996 | ||||
| RECOMMENDED SAVINGS* | $10,412 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $3,470 | - |
$1,924
35,816
kWh
|
$1,050
-
kW-mo/yr
|
$495
-
MMBtu
|
|
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $2,929 | - |
$1,214
22,604
kWh
|
$1,591
-
kW-mo/yr
|
$125
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,484 | $2,740 |
$1,111
20,691
kWh
|
$373
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,396 | $4,125 |
$1,045
19,462
kWh
|
$351
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,131 | - |
$787
14,663
kWh
|
$344
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $10,412 | $6,865 |
$6,081
113,236
kWh
|
$3,710
-
kW-mo/yr
|
$620
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs