ITAC Assessment: OK0424
ITAC logo
ITAC Assessment: OK0424
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Submersible Electric Motors & Pumpin
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $50
M
to 100
M
# of Employees 680
Plant Area 330,000
ft2
Annual Production 7,500
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $505,115 10,162,661
kWh
Natural Gas $164,849 51,494
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,328 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,778

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,495 $12,752 $10,495
162,661
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $10,237 $10,548 $10,237
243,845
kWh
-
03 2.6231: Utilize controls to operate equipment only when needed $8,534 $3,000 $8,534
-
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,414 $6,750 $6,414
213,951
kWh
-
05 2.7224: Reduce space conditioning during non-working hours $7,040 $2,250 - $7,040
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,472 $150 $3,472
120,750
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,136 - $2,136
71,219
kWh
-
TOTAL RECOMMENDED $48,328 $35,450 $41,288
812,426
kWh
$7,040
-
MMBtu
TOTAL IMPLEMENTED $39,778 $28,700 $32,738
527,256
kWh
$7,040
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs