ITAC Assessment: GT0876
ITAC logo
ITAC Assessment: GT0876
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Commercial carpet
NAICS 314110: Carpet and Rug Mills
SIC 2273: Carpets and Rugs
Sales Range $50
M
to 100
M
# of Employees 384
Plant Area 441,230
ft2
Annual Production 84,920,720
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $369,138 8,768,000
kWh
Electricity Demand $306,311 27,393
kW-mo/yr
Natural Gas $345,701 55,749
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $128,876 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $113,539

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,786 $1,500 $4,966
170,820
kWh
$3,820
-
kW-mo/yr
- -
02 3.2111: Install redundant equipment to avoid losses caused by equipment failure and routine maintenance $307 $50 $201
6,927
kWh
$106
-
kW-mo/yr
- -
03 2.4322: Use or replace with energy efficient substitutes $4,989 $10,500 $2,820
97,020
kWh
$2,169
-
kW-mo/yr
- -
04 2.2135: Repair and eliminate steam leaks $1,027 $300 - - $1,027
-
MMBtu
-
05 2.2211: Use optimum temperature $103,726 $187,530 - - $103,726
-
MMBtu
-
06 3.4111: Use closed cycle process to minimize waste water production $10,041 $20,000 - - - $10,041
-
Tgal
TOTAL RECOMMENDED $128,876 $219,880 $7,987
274,767
kWh
$6,095
-
kW-mo/yr
$104,753
-
MMBtu
$10,041
-
Tgal
TOTAL IMPLEMENTED $113,539 $189,330 $4,966
170,820
kWh
$3,820
-
kW-mo/yr
$104,753
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs