matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WM0249 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,131 | - |
n/a
|
| WM0249 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,396 | $4,125 |
n/a
|
| WM0249 #03 Y:2025 | 03 | 2025 | Install compressor air intakes in coolest locations | $1,484 | $2,740 |
n/a
|
| WM0249 #02 Y:2025 | 02 | 2025 | Lower temperature during the winter season and vice-versa | $2,929 | - |
n/a
|
| WM0249 #01 Y:2025 | 01 | 2025 | Reduce space conditioning during non-working hours | $3,470 | - |
n/a
|
| NL0122 #07 Y:2025 | 07 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $931 | $90 |
n/a
|
| NL0122 #06 Y:2025 | 06 | 2025 | Change rate schedules or other changes in utility service | $1,242 | $120 |
n/a
|
| NL0122 #05 Y:2025 | 05 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $1,650 | $12,200 |
n/a
|
| NL0122 #04 Y:2025 | 04 | 2025 | Turn off equipment when not in use | $5,864 | $120 |
n/a
|
| NL0122 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $5,944 | $13,202 |
n/a
|
| NL0122 #02 Y:2025 | 02 | 2025 | Optimize plant power factor | $10,000 | $15,600 |
n/a
|
| NL0122 #01 Y:2025 | 01 | 2025 | Use waste heat from hot flue gases to preheat | $58,962 | $417,000 |
n/a
|
| WV0694 #06 Y:2025 | 06 | 2025 | Eliminate or reduce compressed air usage | $333 | $359 |
n/a
|
| WV0694 #05 Y:2025 | 05 | 2025 | Install occupancy sensors | $361 | $500 |
n/a
|
| WV0694 #04 Y:2025 | 04 | 2025 | Reduce the pressure of compressed air to the minimum required | $398 | $700 |
n/a
|
| WV0694 #03 Y:2025 | 03 | 2025 | Upgrade controls on compressors | $425 | $1,975 |
n/a
|
| WV0694 #02 Y:2025 | 02 | 2025 | Establish a predictive maintenance program | $551 | $2,300 |
n/a
|
| WV0694 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,845 | $945 |
n/a
|
| SF0637 #09 Y:2025 | 09 | 2025 | Use solar heat to make electricty | $259,385 | $1,518,722 |
n/a
|
| SF0637 #08 Y:2025 | 08 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $27,397 | $47,899 |
n/a
|