ITAC Assessment: SJ0031
ITAC logo
ITAC Assessment: SJ0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Flexible Food Packaging
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 200,000
ft2
Annual Production 1,500,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,327,414 9,025,392
kWh
Electricity Demand $1,163,463 17,436
kW-mo/yr
Natural Gas $435,330 25,590
MMBtu
TOTAL YEARLY COSTS $2,926,207
RECOMMENDED SAVINGS* $102,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,602 $4,651 $1,550
10,546
kWh
$2,052
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $61,665 $21,632 $61,665
419,492
kWh
-
03 2.6218: Turn off equipment when not in use $25,779 - $25,779
175,368
kWh
-
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $11,204 $2,890 $11,204
76,212
kWh
-
TOTAL RECOMMENDED $102,250 $29,173 $100,198
681,618
kWh
$2,052
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs