Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Corrugated Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 458,000
ft2
Annual Production 1,248
thousand feet
Production Hrs. Annual 6,229
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $296,474 8,128,650
kWh
Electricity Demand $141,747 17,352
kW-mo/yr
Electricity Fees $12,456 -
Natural Gas $289,682 50,689
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,119 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,456

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.4226: Use / purchase optimum sized compressor $7,969 $1,900 $3,514
97,422
kWh
$4,455
-
kW-mo/yr
- -
02 3.6112: Use filter and drying oven to reduce sludge volume $8,100 $11,960 - - - $8,100
-
Tgal
03 2.6231: Utilize controls to operate equipment only when needed $2,675 $170 $2,675
74,162
kWh
- - -
04 2.7135: Install occupancy sensors $1,516 $320 $1,516
42,017
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,011 $989 $366
10,155
kWh
$645
-
kW-mo/yr
- -
06 2.2136: Install / repair insulation on steam lines $663 $150 - - $663
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $185 $345 $125
3,434
kWh
$60
-
kW-mo/yr
- -
TOTAL RECOMMENDED $22,119 $15,834 $8,196
227,190
kWh
$5,160
-
kW-mo/yr
$663
-
MMBtu
$8,100
-
Tgal
TOTAL IMPLEMENTED $21,456 $15,684 $8,196
227,190
kWh
$5,160
-
kW-mo/yr
- $8,100
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs