| Assessment Year | 2001 |
|---|---|
| Principal Product | Corrugated Boxes |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
458,000
ft2
|
| Annual Production | 1,248
thousand feet
|
| Production Hrs. Annual | 6,229
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $296,474 | 8,128,650 |
kWh
|
$0.036 |
| Electricity Demand | $141,747 | 17,352 |
kW-mo/yr
|
$8.17 |
| Electricity Fees | $12,456 | - |
|
- |
| Natural Gas | $289,682 | 50,689 |
MMBtu
|
$5.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,119 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,456 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4226: Use / purchase optimum sized compressor | $7,969 | $1,900 |
$3,514
97,422
kWh
|
$4,455
-
kW-mo/yr
|
- | - | |
| 02 | 3.6112: Use filter and drying oven to reduce sludge volume | $8,100 | $11,960 | - | - | - |
$8,100
-
Tgal
|
|
| 03 | 2.6231: Utilize controls to operate equipment only when needed | $2,675 | $170 |
$2,675
74,162
kWh
|
- | - | - | |
| 04 | 2.7135: Install occupancy sensors | $1,516 | $320 |
$1,516
42,017
kWh
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,011 | $989 |
$366
10,155
kWh
|
$645
-
kW-mo/yr
|
- | - | |
| 06 | 2.2136: Install / repair insulation on steam lines | $663 | $150 | - | - |
$663
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $185 | $345 |
$125
3,434
kWh
|
$60
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $22,119 | $15,834 |
$8,196
227,190
kWh
|
$5,160
-
kW-mo/yr
|
$663
-
MMBtu
|
$8,100
-
Tgal
|
||
| TOTAL IMPLEMENTED | $21,456 | $15,684 |
$8,196
227,190
kWh
|
$5,160
-
kW-mo/yr
|
- |
$8,100
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs