Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

596

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other miscellaneous chemical product and preparation manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0674 #09 Y:2024 Insulate bare equipment $148 $482
WV0674 #08 Y:2024 Reduce the pressure of compressed air to the minimum required $225 $88
WV0674 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $393 $122
WV0674 #06 Y:2024 Upgrade controls on compressors $562 $2,318
WV0674 #05 Y:2024 Replace existing hvac unit with high efficiency model $658 $3,214
WV0674 #04 Y:2024 Analyze flue gas for proper air/fuel ratio $696 $1,133
WV0674 #03 Y:2024 Replace existing hvac unit with high efficiency model $3,331 $12,440
WV0674 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,374 $8,262
WV0674 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $10,766 $8,674
SD0661 #13 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $7,043 $19,842
SD0661 #12 Y:2024 Use heat from boiler blowdown to preheat boiler feed water $12,725 $11,775
SD0661 #11 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $970 $1,863
SD0661 #10 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $7,652 $2,148
SD0661 #09 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $17,243 $7,340
SD0661 #08 Y:2024 Adopt in-house material generation $809,075 $47,546
SD0661 #07 Y:2024 Reduce the pressure of compressed air to the minimum required $854 $250
SD0661 #06 Y:2024 Recharge batteries on during off-peak demand periods $2,354 -
SD0661 #05 Y:2024 Recharge batteries on during off-peak demand periods $10,205 -
SD0661 #04 Y:2024 Recharge batteries on during off-peak demand periods $3,584 $4,191
SD0661 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,348 $676