ITAC Assessment: UL2610
ITAC logo
ITAC Assessment: UL2610
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Nanowire Materials
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 6
Plant Area 18,990
ft2
Annual Production 25
ton
Production Hrs. Annual 2,080
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,013 330,796
kWh
Electricity Demand $43,554 1,640
kW-mo/yr
Electricity Fees $6,563 -
Natural Gas $8,547 2,019
MMBtu
Other Gas $12,238 1
MMBtu
TOTAL YEARLY COSTS $91,915
RECOMMENDED SAVINGS* $39,152 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.1122: Re-size charging openings or add a movable door on equipment $286 $500 $286
4,396
kWh
- -
02 2.2511: Insulate bare equipment $2,011 $1,050 $2,011
31,670
kWh
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,056 - - $6,056
-
kW-mo/yr
-
04 2.3212: Optimize plant power factor $5,290 $26,000 - - $5,290
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,804 $6,617 $9,804
154,246
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,253 $315 $1,253
19,728
kWh
- -
07 2.7135: Install occupancy sensors $102 $386 $102
1,604
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $2,565 $11,013 $736
11,583
kWh
$1,829
-
kW-mo/yr
-
09 2.9114: Use solar heat to make electricty $11,785 $116,051 $6,453
101,591
kWh
$5,332
-
kW-mo/yr
-
TOTAL RECOMMENDED $39,152 $161,932 $20,645
324,818
kWh
$13,217
-
kW-mo/yr
$5,290
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs