ITAC Assessment: UW2608
ITAC logo
ITAC Assessment: UW2608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Food & Bath Products
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 112,375
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 3,640
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,089 786,480
kWh
Electricity Demand $26,795 2,702
kW-mo/yr
Electricity Fees $11,890 -
Natural Gas $54,864 4,054
MMBtu
Other Gas $4,998 1
MMBtu
Waste Disposal Costs
Water Usage $10,981 349
Tgal
Solid Waste (non-haz) $11,000 72,800
lb
TOTAL YEARLY COSTS $231,617
RECOMMENDED SAVINGS* $47,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,184 $4,323 $1,773
12,558
kWh
$411
-
kW-mo/yr
- -
02 2.8117: Install sub-metering equipment $536 $2,538 $435
3,076
kWh
$101
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $866 $3,757 $(-15.0)
(-105)
kWh
- $881 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $27,442 $241,364 $22,636
160,309
kWh
$4,806
-
kW-mo/yr
- -
05 2.7261: Install timers and/or thermostats $1,557 $5,012 - - - $1,557
-
MMBtu
06 2.8114: Change rate schedules or other changes in utility service $14,488 - - - - $14,488
-
MMBtu
TOTAL RECOMMENDED $47,073 $256,994 $24,829
175,838
kWh
$5,318
-
kW-mo/yr
$881 $16,045
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs