ITAC Assessment: DL0280
ITAC logo
ITAC Assessment: DL0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Activated Carbon Purification Product
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 10
Plant Area 45,000
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 4,800
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,127 973,563
kWh
Electricity Demand $80,204 4,446
kW-mo/yr
Electricity Fees $10,249 -
Natural Gas $12,985 1,066
MMBtu
Other Gas $1,638 1
MMBtu
TOTAL YEARLY COSTS $191,203
RECOMMENDED SAVINGS* $19,351 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,072 - $2,072
23,540
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,559 $4,000 $3,559
40,445
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $782 $2,000 $782
8,889
kWh
-
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $9,022 $42,200 $2,961
33,644
kWh
$6,061
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,916 - $2,596
29,499
kWh
$1,321
-
kW-mo/yr
TOTAL RECOMMENDED $19,351 $48,200 $11,970
136,017
kWh
$7,382
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs