Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

223

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Soap and other detergent manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0279 #03 Y:2023 Eliminate combustible gas in flue gas $205,098 $12,050
IC0279 #02 Y:2023 Insulate bare equipment $2,613 $254
IC0279 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $538 $1,455
OK1060 #05 Y:2021 Optimize plant power factor $352 $1,500
OK1060 #04 Y:2021 Install sub-metering equipment $2,400 $992
OK1060 #03 Y:2021 Reduce the pressure of compressed air to the minimum required $471 -
OK1060 #02 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $13,541 $11,594
OK1060 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $445 $1,989
IP0149 #08 Y:2021 Replace obsolete burners with more efficient ones $8,424 $30,935
IP0149 #07 Y:2021 Apply for tax-free status for energy purchases $4,813 $8,000
IP0149 #06 Y:2021 Recover waste heat from equipment $1,621 $2,279
IP0149 #05 Y:2021 Install occupancy sensors $330 $450
IP0149 #04 Y:2021 Utilize energy-efficient belts and other improved mechanisms $416 $380
IP0149 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $20,309 $8,100
IP0149 #02 Y:2021 Reduce the pressure of compressed air to the minimum required $982 $120
IP0149 #01 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $1,671 $95
SD0611 #07 Y:2021 Preheat boiler makeup water with waste process heat $2,308 $6,000
SD0611 #06 Y:2021 Install smaller boiler (increase high fire duty cycle) $45,722 $186,400
SD0611 #05 Y:2021 Install occupancy sensors $203 $387