Assessment Year | 2023 |
---|---|
Principal Product | Water Soluble Film |
NAICS | 325611: Soap and Other Detergent Manufacturing |
SIC | 2841: Soap and Other Detergents, Except Specialty Cleaners |
Sales Range | $50 M to 100M |
# of Employees | 466 |
Plant Area |
305,986
ft2
|
Annual Production | 15,757
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $679,448 | 15,261,120 |
kWh
|
$0.045 |
Electricity Demand | $731,804 | 27,993 |
kW-mo/yr
|
$26.14 |
Electricity Fees | $313,761 | - |
|
- |
Natural Gas | $2,878,864 | 411,680 |
MMBtu
|
$6.99 |
TOTAL YEARLY COSTS | $4,603,877 | |||
RECOMMENDED SAVINGS* | $1,188,528 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,656 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $538 | $1,455 |
$300
6,658
kWh
|
$238
-
kW-mo/yr
|
- | |
02 | 2.2511: Insulate bare equipment | $2,613 | $254 | - | - |
$2,613
-
MMBtu
|
|
03 | 2.1115: Eliminate combustible gas in flue gas | $205,098 | $12,050 | - | - |
$205,098
-
MMBtu
|
|
04 | 2.2121: Increase amount of condensate returned | $89,401 | $210,300 | - | - |
$89,401
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $21,146 | $4,937 |
$11,856
259,060
kWh
|
$9,290
-
kW-mo/yr
|
- | |
06 | 2.2427: Use waste heat from hot flue gases to preheat incoming fluids | $26,751 | $41,956 | - | - |
$26,751
-
MMBtu
|
|
07 | 2.1212: Operate boilers on high fire setting | $3,858 | $72 | - | - |
$3,858
-
MMBtu
|
|
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $58,649 | $36,118 |
$32,653
725,626
kWh
|
$25,996
-
kW-mo/yr
|
- | |
09 | 2.9114: Use solar heat to make electricty | $159,499 | $2,716,228 |
$122,900
2,731,034
kWh
|
$36,600
-
kW-mo/yr
|
- | |
10 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $610,617 | $3,463,096 |
$1,224,164
28,301,458
kWh
|
- |
$(-613,547.0)
-
MMBtu
|
|
11 | 2.2135: Repair and eliminate steam leaks | $10,359 | $750 | - | - |
$10,359
-
MMBtu
|
|
TOTAL RECOMMENDED | $1,188,528 | $6,487,216 |
$1,391,872
32,023,836
kWh
|
$72,123
-
kW-mo/yr
|
$(-275,467.7)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $34,656 | $7,396 |
$12,156
265,718
kWh
|
$9,528
-
kW-mo/yr
|
$12,972
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs