Assessment Year | 2010 |
---|---|
Principal Product | Surface Finishing by Cut-Wire Peening and Vibratory Milling of Turbine A |
NAICS | 332811: Metal Heat Treating |
SIC | 3398: Metal Heat Treating |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
13,000
ft2
|
Annual Production | 216,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,397 | 1,429,733 |
kWh
|
$0.095 |
Electricity Demand | $38,109 | 4,276 |
kW-mo/yr
|
$8.91 |
Electricity Fees | $(-2,882.0) | - |
|
- |
Natural Gas | $1,008 | 20 |
MMBtu
|
$50.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,734 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,975 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $15,680 | $58,600 |
$15,680
164,361
kWh
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $3,642 | $18,330 |
$3,642
36,299
kWh
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,625 | $2,000 |
$3,285
34,444
kWh
|
$(-1,660.0)
-
MMBtu
|
|
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,470 | $200 |
$1,470
15,400
kWh
|
- | |
05 | 2.7135: Install occupancy sensors | $1,134 | $3,150 |
$1,134
11,886
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,028 | $480 |
$1,028
10,782
kWh
|
- | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $155 | $180 |
$155
1,617
kWh
|
- | |
TOTAL RECOMMENDED | $24,734 | $82,940 |
$26,394
274,789
kWh
|
$(-1,660.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,975 | $77,790 |
$21,975
228,459
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs