ITAC Assessment: MA0665
ITAC logo
ITAC Assessment: MA0665
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Surface Finishing by Cut-Wire Peening and Vibratory Milling of Turbine A
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 13,000
ft2
Annual Production 216,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,397 1,429,733
kWh
Electricity Demand $38,109 4,276
kW-mo/yr
Electricity Fees $(-2,882.0) -
Natural Gas $1,008 20
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,975

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4224: Upgrade controls on compressors $15,680 $58,600 $15,680
164,361
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $3,642 $18,330 $3,642
36,299
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,625 $2,000 $3,285
34,444
kWh
$(-1,660.0)
-
MMBtu
04 2.6212: Turn off equipment during breaks, reduce operating time $1,470 $200 $1,470
15,400
kWh
-
05 2.7135: Install occupancy sensors $1,134 $3,150 $1,134
11,886
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,028 $480 $1,028
10,782
kWh
-
07 2.7111: Reduce illumination to minimum necessary levels $155 $180 $155
1,617
kWh
-
TOTAL RECOMMENDED $24,734 $82,940 $26,394
274,789
kWh
$(-1,660.0)
-
MMBtu
TOTAL IMPLEMENTED $21,975 $77,790 $21,975
228,459
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs