Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
$
$
ARC 2+ Digits Required
NAICS In-vitro diagnostic substance manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0539 #04 Y:2022 Replace existing hvac unit with high efficiency model $37,300 $127,125
LE0539 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $3,436 $6,624
LE0539 #02 Y:2022 Install timers and/or thermostats $3,105 $1,650
LE0539 #01 Y:2022 Lower compressor pressure through a/c system modification $136 $40
IP0141 #05 Y:2020 Utilize higher efficiency lamps and/or ballasts $2,298 $5,206
IP0141 #04 Y:2020 Apply for investment incentives $2,218 $2,000
IP0141 #03 Y:2020 Apply for investment incentives $15,156 $10,000
IP0141 #02 Y:2020 Use or replace with energy efficient substitutes $609 -
IP0141 #01 Y:2020 Lower temperature during the winter season and vice-versa $298 -
SD0572 #05 Y:2018 Install occupancy sensors $349 $378
SD0572 #04 Y:2018 Reduce the pressure of compressed air to the minimum required $970 $1,350
SD0572 #03 Y:2018 Eliminate or reduce compressed air usage $2,372 -
SD0572 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $21,304 $22,430
SD0572 #01 Y:2018 Recharge batteries on during off-peak demand periods $75,389 $234,915